OIL TANKER & GAS CARRIER TERMINALS

OIL TANKER & GAS CARRIER TERMINALS

  • Jetty and Sea Isle structures
  • Mediterranean (Multi) Buoy Moorings
  • Single Point Moorings (not the buoy itself)

JETTY FOR HFO UNLOADING

HUTA MARINE WORKS

RABIGH, Saudi Arabia

The jetty accommodates tankers 20,000 – 100,000 DWT

Unloading platform, Four (4) breasting dolphins and six (6) mooring dolphins. Platform and dolphins constructed as RC deck (precast units, filled in situ with concrete) on steel driven piles. Rubble mount causeway and trestle to bridge the causeway to the platform.

SPM FACILITY

TRAFIGURA AS

Corpus Christi, Texas, USA

Concept design review and tendering for a new SPM facility.

TANKER MOORING AND UNLOADING FACILITIES UPGRADE

CORAL

Chania, Greece

Technical Consultant during implementation for the upgrade of berthing, mooring and oil products unloading system for a facility which is located in a very narrow natural bay.

STUDY AND DESIGN OF JETTY UPGRADING

HUTA MARINE WORKS

Yanbu, Saudi Arabia

The services consisted of a study and design for accommodation of a benzene ship of 20.000 DWT at an existing facility which served larger tankers.

SPM RELOCATION

KPONE MARINE SERVICES LTD

Tema, Ghana

Design review and Relocation of Crude SPM for 155,000 DWT vessels and 500 m Pipeline extension and PLEM.

S070 LIQUID BERTH JETTY

HUTA-HEGERFELD

Rabigh, Saudi Arabia

Installation Design fot two (2) SPM systems and  twin pipeline 42” , measuring length 7km, connecting the tank farm with the SPMs

NEW BERTHING AND MOORING FACILITIES FOR VLCC

MOTOROIL HELLAS

Ag. Theodoroi, Greece.

Monopiles’ for berthing and mooring of oil tankers and new gangways for ship/shore connection.

SPM RELOCATION

DAEWOO ENGINEERING & CONSTRUCTION

Uslan, South Korea

S-Oil SPM relocation project. Installation Design for Dredging a trench and the installation of 42“ pipeline and the installation of a PLEM (Pipe Line End Manifold system). The offshore section of the project consists of 2.5km trench, designed for the 42” pipeline; 3.2km 42” subsea pipeline and a PLEM with 42” and 24” piping and valves.

CBM FACILITY

PUMA Energy

San Jose, Guatemala

CBM Terminal Marine engineering system analysis of the existing terminal configuration; Design of the upgraded terminal configuration and operability; Preparation of mooring/operability tables for the management of mooring decision making processes; Preparation of the terminal Operations and Maintenance manual; Budget estimates for the procurement of the upgrades and Construction oversight of the upgrade works.

REHABILITATION OF BREASTING DOLPHINS

MOTOROIL HELLAS

Ag. Theodoroi, Greece

Detailed design for multi pile breasting dolphins rehabilitation and installation of  QRMH in replacement of existing bollards.

BERTH 54 TANKER TERMINAL AT KING FAHD PORT

HUTA-HEGERFELD

Jubail, Saudi Arabia

The jetty accommodates chemical products’ tankers 20,000 – 80,000 DWT. Platform, four (4) breasting dolphins and four (4) mooring dolphins. Platform  constructed as RC deck (precast units, filled in situ with concrete) on steel driven piles. Dolphins constructed as large diameter monopiles. Six (6) steel structure catwalks connect the platform with the shore.

TANKER MOORING AND UNLOADING FACILITIES UPGRADE

GREEK PUBLIC POWER AUTHORITY

Lavrion, Greece

Design of the rehabilitation and upgrading of the existing port facilities in order to accommodate tankers up to 50,000 DWT.

CBM FACILITY

AVIN

Kavala, Greece

Design of a Multi Buoy Mooring Facility for oil products unloading of tankers up to 30,000 DWT.

FEASIBILITY STUDY FOR A NEW FSRU TERMINAL

ELPEDISON

Thessaloniki Gulf, Greece

Study of all up to date alternatives including SPM, Spread Mooring, CBM mooring of LNG Carrier or FSRU. Transfer of NG via uw pipeline or Barges. SWOT analysis.